Builder Name:Kent Ingram   -  
Project:   Rans - S-21 Outbound   -   VIEW REPORTS
Total Hours:538.2
Total Flight Time:
Start/Last Date:May 09, 2020 - No Finish Date
 
Friendly URL: https://eaabuilderslog.org?s=S-21

Home or Last Project Picture

May 14, 2023     Phasing Ignition Coils, add ground wire - (3 hours)       Category: Engine
‘‘Twas the day to phase the Lightspeed ignition boxes to fire the correct coils. I needed to mount the prop spacer and propeller first, at least temporarily. This required more time than the actual testing and determination of which coils needed to be hooked to which coax wires. I still need to add ends onto the ignition control coax wires to hook to the coils.

I also added a ground wire from the right side upper engine mount bolt (to firewall) to the Forrest of tabs ground block that I have mounted on the middle of the cabin side of the firewall.


 